Customization: | Available |
---|---|
After-sales Service: | Spare Parts Can Be Offered |
Warranty: | 12 Months |
Suppliers with verified business licenses
Audited by an independent third-party inspection agency
· Performance steady, lowest malfunction rate
· No waste slurry for using dry-hard concrete material
· Variable frequency speed control motor and a frequency conversion controller
· Field installation, commissioning and training, Free spare parts, Field maintenance, and repair service
Pre-sale service: plant/site plan, solve technical problems and auxiliary configuration advice, revenue analysis.
Sale service: door-to-door installation, on-site training operation technology, user training mechanical and electrical maintenance personnel free of charge.
After-sales service: guarantee the supply of spare parts, product quality strictly implement five guaranty, one year warranty, life-long after-sales service, one of the China's factory with integration solutions for brick, mixing station.
Q:Do you have set up an independent factory?
A:We have our own factory. Has the specialized cement machinery product equipment factory, also has the large-scale cement drain pipe production factory.
Q:What can you do for us?
A:1. Before sales can be targeted to give some constructive Suggestions. 2.Make a specific plan for your needs. 3. After sales reference specific products, different products have different services. Refer to the specific product description.
Q: Can you do the basic design for us?
A: Yes, we have a professional team with rich experience in basic design of cement pipe making equipment with CAD software. You just need to tell us your ideas and requirements, and we will provide you with the most perfect design.
Q:Can your engineers train our workers in our factories?
A:Yes, we have a very large engineering installation team that can train and instruct your workers to operate the installation equipment.
Q:If we provide the parameter requirements, can we make it to order?
A:We provide customized services as long as you provide the appropriate drawings and product requirements.
Q:How long is your lead time?
A:Our delivery time varies according to the quantity of the order, usually around 30 days.