1.QTM4-30 mobile block making machine introduction.
1 Multi functional
QTM4-30 Can change moulds to make various hollow blocks,solid block and interlock paver.
2.Low investment.
QTM4-30 mobile block machine driectly lays block on grounds,no pallets are required.Total investment is lower than machine requiring pallets.
3.Easy operation and Maintence.
QTM4-30 moving block machine is shipped as a whole.No installation is needed.You can use it directly after connecting with powr.
2.QTM4-30 Main technical parameters
No |
ITEM |
Function |
Motor |
Technical details |
1 |
JD350 mixer |
Used to mixer various raw materails like sand,fly ash cement,stone dust,aggregate. |
5.5KW |
Diameter"1.2M |
2 |
QT40-3A moving block machine |
Adopting electrical vibration,it can make various hollow block,solid brick by walking on ground |
4.89KW |
No need installation ,can operate after connecting power |
3.QTM4-30 Main technical parameters
Dimension of host machine |
1800×1400×1100mm |
Vibration force |
35.5KN |
Production cycle |
25S |
Packing size |
5m3 |
Capacity |
4.89KW |
Weight of the machine |
0.8T |
Voltage |
As per local condition |
4. QTM4-30 moving block machine Production Capacity
Size(mm) |
Pcs/Mould |
Pcs/ Hr |
Pcs/ 8 Hr |
400X150X200 |
5 |
600 |
4800 |
400X200X200 |
4 |
480 |
3840 |
400X100X200 |
7 |
840 |
6720 |
400X250X200 |
3 |
360 |
2880 |
5.JD350 concrete mixer technical parameter
Main Technical Specifications |
Discharging capacity |
0.35 m3 |
Feeding capacity |
0.56 m3 |
Productivity |
≥4m3/h |
Max. aggregates diameter |
80mm |
Mixer power |
5.5 KW |
Diameter |
1200mm |
Weight |
0.42Ton |
6.QTM4-30 concrete block machine employees needed
- Mixing part:1 labor
- QTM4-30 moving block machine:1 labor
- Block stacking:2-3 labors
7.Raw material formula
1.Cement :8%-10% sand:30%-40% small chips:50-60%
2.Sand:60% fly ash :30% cement:8-10% lime:2%
3.Color material formula:50kgs cement,100kgs sand ,3kgs color material
Remark:the formula varies as per the local raw material quality.
8.Block curing
The block can be taken offer pallet after 18-24hours.In hot place like middle east,blocks can be taken after several hours
In the first 3-5 days,spray water on the block.Then dry the block for 10-15 days.The block is done.
The blocks can be finished product after 9 hours if there is curing room
9.Service
♦Pre-sales
1 Perfect 7*24hours inquiry and professinal consulting service
2.Visit our factory anytime
♦Sale
1. Update the production shedule in time
2. Quality supervision
3. Product acceptance
4. Shipping on time
♦After-sales
1. Guarantee:1 year ,during this period we will offer free spare parts if they are broken.
2. Training how to install and use machine
3. Engineers available to service overseas
4. Skill support the whole using life