Qt4-15 Automatic Hydraulic Concrete Block Machine in Bangladesh for Hollow Blocks

Product Details
Customization: Available
Certification: CE, ISO
Customized: Customized

360° Virtual Tour

Diamond Member Since 2019

Suppliers with verified business licenses

Audited Supplier

Audited by an independent third-party inspection agency

Number of Employees
4
Year of Establishment
2017-09-21
  • Qt4-15 Automatic Hydraulic Concrete Block Machine in Bangladesh for Hollow Blocks
Find Similar Products

Basic Info.

Model NO.
QT4-15
Automatic Grade
Automatic
Type
Hydraulic Shock
Pallet Size
900*700mm
Production Cycle
15-20s
Vibration Strength
70-90kn
Products
Cement Hollow Block Solid Brick Color Paver
Raw Material
Cement Sand Fly Ash Stone Dust
Labor Required
5-6 Labors
Workshop Area
150m2
Land Area
1200-2500
Mixer Model
Js500
Batching Machine
PLD1200
Transport Package
Nude Packing
Specification
Q345 STEEL
Trademark
BRICK MATE
Origin
China
HS Code
8474809090
Production Capacity
25 Sets/Month

Product Description

1.QT4-15 concrete block making machine flow chart

 
No Equipment name Function Qty
Batching part
1 Cement silo
(optional part)
Used to store cement 1set
2 Screw conveyor
(optional part)
Used to transport cement into cement scale 1set
3 Cement scale
(optional part)
Used to scale cement 1set
4 PLD1200 batching machine Used to scale various material like sand,stone dust,aggregate 1set
5 JS500 Mixer Used to Mix various materials   1set
6 Belt conveyor Used to transport mixed material into block machine hopper 1set
Block making part
1 Block making machine Make material into various cement hollow block,solid brick,paver brick,curbstone 1set
2 PLC control unit PLC is used to control the block machine running.We have Siemens Mitsubishi brand.The plc is equipped with VFD inverter,can control motor vibration frequency when making different blocks 1set
3 Hydraulic station Hydraulic station offers hydraulic shock to mould area.The hydraulic valuve we use is YUKEN brand 1set
4 Stacker Used to lay blocks bricks layer by layer 1set

2.QT4-15 Concrete block making machine technical parameter
Overall size  3550x2150x2750mm Host machine power 29.3KW
Molding period 15-20S Vibration Frequency 4100time/min
Pallet Size 965520mm Pallet quantity 1200pcs
Vibration Force 16-20Mpa Vibration type Table vibration
Voltage As per local condition
Theoretical workshop area : 150m2 , Need about 3-4workers .the office , curing area and
stacking area to arrange according your fact status.

3.QT4-15 concrete block making machine production capacity
 
Size(mm) Pcs/Mould Pcs/ Hr Pcs/ 8 Hr
400x100x200 7 1680 13440
400x150x200 5 1200 9600
400*200*200 4 960 7680
 200*100*60  Holland paver 16 2880 23040
225×112.5×80 Zigzag paver
 
14 2520 20160
500*100*300 kerbstone 1 180 1440
500*100*350 kerbstone 1 180 1440
1.We can design mould as per client requests
2.Capacity above is indicative only,The actual capacity varies with operator efficiency and material quality etc

4.QT4-15 block making machine motor list
No. Item Quantity Motor(KW) Sub total
1 Batching machine 3sets 4 12
2 JS500 mixer Mixing motor 1set 18.5 25.1
Lifting motor 1set 5.5
Water pump gear box motor 1set 1.1
3 Belt conveyor 1set 1.1 1.1
4 QT4-15
Block machine
Pallet feeder 1set 1.1 29.3
Material scattering machine 1set 2.2
Vibration motor 2sets 5.5
Hydraulic station motor 1set 15
5 Stacker Vertical lifting Motor 1set 1.5 3.5
Horizontal Motor 1set 2
TOTAL 71KW

5.QT4-15 concrete block machine employees needed
  1. Mixing part:1 labor
  2. Pallet feeder:1labor(this can be replaced by pallet feeding machine)
  3. Host machine control:1labor
  4. Forklift driver:1 labor
  5. Daily technical maintenance:1 labor
  6. Block stacking:2-3 labors

6.Raw material formula

1.Cement :8%-10% sand:30%-40% small chips:50-60%
2.Sand:60% fly ash :30% cement:8-10% lime:2%
3.Color material formula:50kgs cement,100kgs sand ,3kgs color material
Remark:the formula varies as per the local raw material quality.

7.Block curing

  The block can be taken offer pallet after 18-24hours.In hot place like middle east,blocks can be taken after several hours
  In the first 3-5 days,spray water on the block.Then dry the block for 10-15 days.The block is done.
  The blocks can be finished product after 9 hours if there is curing room

8.BrickMate Service
♦Pre-sales
1 Perfect 7*24hours inquiry and professinal consulting service
2.Visit our factory anytime

♦Sale
1. Update the production shedule in time
2. Quality supervision
3. Product acceptance
4. Shipping on time

♦After-sales
1. Guarantee:1 year ,during this period we will offer free spare parts if they are broken.
2. Training how to install and use machine
3. Engineers available to service overseas
4. Skill support the whole using life
 

Send your message to this supplier

*From:
*To:
*Message:

Enter between 20 to 4,000 characters.

This is not what you are looking for? Post a Sourcing Request Now
Contact Supplier